Crown Energy Solutions (CES) installed additional propane storage at the Ayer and Goss propane bulk plant at their location in Henniker, NH. CES constructed two sets of concrete tank piers to support the tanks. A crane and truck service was provided to remove the tanks from the flatbed trailer and install them onto the concrete piers. CES provided Ayer and Goss with two new 30,000 gallon water capacity propane storage tanks equipped with an indicating dial thermometers, 0-300 psi gauge, magnitel, liquid and vapor shut off valves, nitrogen-activated internal valves and relief valves with risers and weather caps. The new tanks were painted and color coded. All necessary piping was completed for both liquid and vapor lines, which included all Schedule 80 pipe and forged steel fittings. All necessary valves and related equipment were administered to conform to NFPA Pamphlet 58.